When people worry about build costs, they often focus on the wrong things.
Here’s what genuinely drives build costs up, and what usually doesn’t.
What Actually Drives Build Costs Up
1. Site Conditions
The site you build on can have a bigger impact on cost than the house itself.
A section that looks affordable can quickly become expensive if it involves:
Sloping land
Poor ground conditions
Difficult access
Retaining walls or engineered foundations
For example, a cheaper sloping site can require significant earthworks, retaining, drainage and engineering — sometimes costing more overall than paying extra for a flat, build-ready section.
2. Engineering Requirements
Engineering is one of the most underestimated cost drivers.
More complex designs often require:
Large Engineered structural beams
Additional steel and concrete
Multiple engineer inspections and staged sign-offs
If your home design includes engineered elements, there will be ongoing engineering involvement throughout the course of the build. During construction, engineers will need to inspect, approve, or adjust details at various stages to ensure compliance and sign-off. While this is normal and necessary, it can add both cost and time to the build. In many cases, a similar outcome can be achieved through thoughtful design choices that reduce the level of structural engineering required or do not require it at all.
3. Design Complexity
Complexity drives cost more than size.
Design features that increase cost include:
Multiple roof lines
Split levels
Long spans or cantilevers
Irregular building shapes
Simple, efficient designs are often more cost-effective — even when they’re larger.
4. High Specifications and Custom Finishes
Specification level has a direct impact on cost.
Custom joinery, premium claddings, high-end kitchens and bespoke detailing all add up. Individually these choices may seem small, but collectively they can significantly affect the final budget — particularly if they’re not allowed for early.
5. Changes During Construction
Changes made once the build is underway almost always cost more.
Late changes can involve:
Re-ordering materials
Reworking completed labour
Delays while decisions are re-approved
Early, well-considered decisions are one of the most effective ways to protect a budget.
What Doesn’t Add as Much Cost as People Expect
Good Planning
Time spent planning properly often reduces cost rather than increasing it. Clear decisions early help avoid variations and inefficiencies later.
Simple, Efficient Layouts
Well-designed spaces that minimise waste and complexity can deliver better value than smaller but inefficient designs.
Early Professional Guidance
Understanding site constraints, engineering implications and realistic costs early helps avoid surprises — and allows smarter decisions to be made before construction begins.
The Big Picture
It’s important to understand how the land you choose and design decisions affect the final cost. Build costs don’t usually blow out because of one just decision.
They increase when site, design, engineering and timing aren’t fully understood upfront.
How Bay Builds Can Help
At Bay Builds, we help clients understand the real cost drivers early — before any decisions are made.
We can:
Assess site challenges realistically
Help balance design and budget
Manage complexity and sequencing
Guide the process from planning through to completion
Whether you’re building new or renovating, clarity early makes all the difference.
Because the best decisions are made before any building starts.